BEGIN:VCALENDAR
VERSION:2.0
PRODID:-//ChamberMaster//Event Calendar 2.0//EN
METHOD:PUBLISH
X-PUBLISHED-TTL:P3D
REFRESH-INTERVAL:P3D
CALSCALE:GREGORIAN
BEGIN:VEVENT
DTSTART:20241114T220000Z
DTEND:20241115T000000Z
X-MICROSOFT-CDO-ALLDAYEVENT:FALSE
SUMMARY:Rte 145 Reconstruction Process Public Meeting
DESCRIPTION:Public Involvement Meeting\n\nProposed Improvements:\n\n\n	Mill and overlay existing asphalt pavement.\n	Reconstruct existing curb ramps.\n	Remove one and replace six guardrails.\n	Replace traffic signal at County Q and WIS 145 intersection.\n	Replace various cross culverts and improve drainage.\n\n\nTraffic Impacts\n\nConstruction is anticipated to start in summer of 2026. WIS 145 will be closed from WIS 100 to WIS 167. A detour will be posted utilizing WIS 100 (Main Street)\, I-41\, and WIS 167 (Mequon Road). Access to local residences and businesses will be maintained.\n\n \n\nShare your feedback!\n\nJoin WisDOT for a public involvement meeting to learn more about the project\, get your questions answered\, and provide input to the project team. Parking will be available in the Village Hall parking lot. The meeting is an open house format without a formal presentation. Representatives from WisDOT and the design consultants will be available to discuss the project and address any questions or concerns. If you would like an interpreter for the meeting\, contact the project manager below. Hearing and visually impaired individuals may request accommodations by calling Wisconsin Telecommunication Relay System (TTY) at 711.
X-ALT-DESC;FMTTYPE=text/html:<h2 aria-hidden="true" id="isPasted" style="box-sizing: border-box\; margin-top: 0.167em\; margin-bottom: 0px\; font-family: Lato\; font-weight: 700\; color: rgb(53\, 118\, 124)\; font-size: 1.4em\;" tabindex="-1">Public Involvement Meeting</h2>\n\n<h3 aria-level="2" class="subhead2" id="isPasted" role="heading" style="box-sizing: border-box\; margin-top: 0px\; margin-bottom: 0px\; font-family: Lato\; font-weight: 700\; color: rgb(36\, 90\, 95)\; font-size: 1.25em\;">Proposed Improvements:</h3>\n\n<ul style="box-sizing: border-box\; margin: 0px 0px 1.4em\; padding-right: 0px\; padding-left: 3em\; font-family: Lato\; color: rgb(56\, 56\, 56)\; line-height: 1.5\; list-style-type: circle\; font-size: 15.2px\;">\n	<li style="box-sizing: border-box\; margin-bottom: 0.35em\;">Mill and overlay existing asphalt pavement.</li>\n	<li style="box-sizing: border-box\; margin-bottom: 0.35em\;">Reconstruct existing curb ramps.</li>\n	<li style="box-sizing: border-box\; margin-bottom: 0.35em\;">Remove one and replace six guardrails.</li>\n	<li style="box-sizing: border-box\; margin-bottom: 0.35em\;">Replace traffic signal at County Q and WIS 145 intersection.</li>\n	<li style="box-sizing: border-box\; margin-bottom: 0.35em\;">Replace various cross culverts and improve drainage.</li>\n</ul>\n\n<h3 aria-level="2" class="subhead2" id="isPasted" role="heading" style="box-sizing: border-box\; margin-top: 0px\; margin-bottom: 0px\; font-family: Lato\; font-weight: 700\; color: rgb(36\, 90\, 95)\; font-size: 1.25em\;">Traffic Impacts</h3>\n\n<p style="box-sizing: border-box\; margin-top: 0px\; margin-bottom: 1.4em\; color: rgb(56\, 56\, 56)\; font-family: Lato\; font-size: 15.2px\;">Construction is anticipated to start in summer of 2026. WIS 145 will be closed from WIS 100 to WIS 167. A detour will be posted utilizing WIS 100 (Main Street)\, I-41\, and WIS 167 (Mequon Road). Access to local residences and businesses will be maintained.</p>\n\n<p style="box-sizing: border-box\; margin-top: 0px\; margin-bottom: 1.4em\; color: rgb(56\, 56\, 56)\; font-family: Lato\; font-size: 15.2px\;">&nbsp\;</p>\n\n<h1 aria-level="2" class="headline" role="heading" style="box-sizing: border-box\; font-family: Lato\; font-weight: 700\; color: rgb(56\, 128\, 135)\;">Share your feedback!</h1>\n\n<p style="box-sizing: border-box\; margin-top: 0px\; margin-bottom: 1.4em\; color: rgb(56\, 56\, 56)\; font-family: Lato\; font-size: 15.2px\;">Join WisDOT for a public involvement meeting to learn more about the project\, get your questions answered\, and provide input to the project team. Parking will be available in the Village Hall parking lot. The meeting is an open house format without a formal presentation. Representatives from WisDOT and the design consultants will be available to discuss the project and address any questions or concerns. If you would like an interpreter for the meeting\, contact the project manager below. Hearing and visually impaired individuals may request accommodations by calling Wisconsin Telecommunication Relay System (TTY) at 711.</p>\n
LOCATION:Village Hall\, Village of Germantown (N112 W17001 Mequon Rd\, WI 53022)
UID:e.2331.8304
SEQUENCE:3
DTSTAMP:20260513T151216Z
URL:https://www.germantownchamber.org/events/details/rte-145-reconstruction-process-public-meeting-8304
END:VEVENT

END:VCALENDAR
